top of page

Other Mooring Equipments

Ship mooring is done during vessel along-siding to; ship to ship (STS), Ship to a harbor, Jetty or during dock. The STS could be during bunkering operations, cargo transfer, tug assistance, etc. Jetty mooring is done when a ship visits the port, SBM, and ship dry dock. Penambatan kapal dilakukan selama kapal berpihak ke; kapal ke kapal (STS), Kapal ke pelabuhan, Dermaga atau selama dermaga. STS tersebut bisa pada saat operasi bunkering, pemindahan kargo, bantuan tug, dll. Penambatan dermaga dilakukan saat kapal mengunjungi pelabuhan, SBM, dan dry dock kapal.”
Ship mooring is done during vessel along-siding to; ship to ship (STS), Ship to a harbor, Jetty or during dock. The STS could be during bunkering operations, cargo transfer, tug assistance, etc. Jetty mooring is done when a ship visits the port, SBM, and ship dry dock. Penambatan kapal dilakukan selama kapal berpihak ke; kapal ke kapal (STS), Kapal ke pelabuhan, Dermaga atau selama dermaga. STS tersebut bisa pada saat operasi bunkering, pemindahan kargo, bantuan tug, dll. Penambatan dermaga dilakukan saat kapal mengunjungi pelabuhan, SBM, dan dry dock kapal.”

Jl. Tongkol No. 6E-F (Ps. Ikan)

Jakarta Utara 14440

Stay Connected with Us

Contact Information

© Copyright MADJU GROUP 2024
bottom of page